December 2018

NCCA installed 800 feet of 8 inch HDPE pipe to replace old leaking deteriorating concrete pipe. This involved fusing together 40 foot sections of pipe, then “slipping” the pipe, pushing it through the old existing concrete pipeline. Even through the job was a straight line, it was challenged by occasional root balls that had to be cleared. Root balls cannot penetrate HDPE pipe so we will never encounter them again in this new stretch of pipeline.