February – March 2019
NCCA installed 300 feet of 36” HDPE pipe to replace old deteriorating open concrete canal along North 40th Ave. The pipe was fused together in 50’ sections then pulled into place and suspended over the open canal until it was all in place.
The pipe was then supported as bracing was pulled, and laid down in the old canal where it was covered over with fill material and top soil. Use of HDPE pipe creates a permanent fix that will withstand decades of use.